If I have number of flights ready to depart (valid TOBT) if I want to increase the number of flights in the queue by adding flights in the gaps between any 2 flights whats the minimum seperation that should be taken into consideration?
example: suppose I have 2 flights the first one is already included in the sequence and it has CTOT. the second flight is still not included in the sequence and has no CTOT(the origin and the des airport not in Europe) and I would like to add it before the first flight since I have time between its TSAT and its TOBT. whats the minimum seperation time that allow me to add another flight?
TOBT => Target Off Block Time (when flight is ready to push back)
CTOT => Calculated Take Off Time (given by the European control management its the slot when the flight should depart (CTOT -5/+10 min))
TSAT => Target Start up Approval Time, when ATC give permission to aircraft to start bush back from its stand
EXOT => Estimated Taxi Out Time